An LEB & Toolbox related to Drilling/Completing a Well - Person in Line of Fire.

What Happened?

During a hydraulic fracturing operation, while pumping the 11th stage of the frac at a rate of 86 BPM (Barrels Per Minute) at 11,300 PSI, an iron failure occurred on a 3-inch threaded 1502 connection that is part of a spring-loaded Pressure Relief Valve (PRV) on the frac manifold. Upon failure of the threads the valve and attached 4-foot long vent line disconnected from the manifold and were scattered across the surrounding area. Although the standard 35-foot buffer zone was in place at the time of the event, the valve body and internals came to rest outside of the buffer zone.

Use our 'Delivering Safety Messages to Groups' worksheet to help you prepare to deliver the LEB toolbox.