What Happened?

A Rig Manager arrived at a rig-site early in the morning and proceeded to switch on the generator for powering up the site. Approximately 15 minutes later there was an explosion in the Tool House. The blast shifted a loader forward 600mm. Debris was found up to 100m away. At the time of the operation the rig was not operational and undergoing maintenance. The Rig Manager was in the Site Manager’s Office and was the only person on site. The remaining crew were due to arrive later that morning. There were no injuries.

Download.Bulletin-01.png

Download.Toolbox-01.png

By clicking Download, you agree to abide by our terms of use

Why did it Happen?

  • Fuel sources and combustibles in the Tool House include oxy/acetylene bottles. Oxy/acetylene had been used the day prior to the incident. The regulator was attached to the bottle and the bottle had been left turned on (slightly). Post incident investigation revealed that the o-ring between the regulator and bottle on the acetylene cylinder was defective and leaking.
  • 3 potential ignition sources were located approximately 1.2m from the oxy/acetylene bottles (welding rod electrode heater box; cordless tool battery charger; radio/stereo). These pieces of electrical equipment had been left plugged in and turned on. They became energised when the generator was switched on 15 minutes prior to the explosion.
  • The Tool House is located on a 14m skid. The doors of the Tool House are a shipping container style with airtight seals to prevent the intake of dust during transport. The doors were locked overnight to prevent theft (the rig site was close to town).

What did they Learn?

  • Re-evaluate the need to have oxy/acetylene on-site as a regular piece of
  • equipment.
  • Assess the risks associated with storage and transport of oxy/acetylene:
  • Consider normal operations and also non-operational aspects
  • Transport short term shutdowns (e.g. overnight shutdowns)
  • decommissioning phases (long term shutdowns)
  • Ensure that assurance activities include a review of the potential risks associated with explosive atmospheres beyond the operational and transport phases of operations where latent potential exists. Controls must be independent of the hazard (e.g. there cannot be a build-up of an explosive atmosphere).
  • Ensure any introduction of oxy/acetylene use is accompanied by a full Management of Change (MoC) process that considers both normal operations and non-operational aspects.

How do HSERs get most value from this Bulletin? 

  • Print the Bulletin and post it to notice boards.
  • Discuss the Learning Event and lessons learned AND use it as a chance to discuss “Could this happen to you?”
  • Send your feedback to Safer Together: [email protected].  

Frontline workers:

  • Actively participate in discussions about this Bulletin. 
  • Ask your frontline leader to provide the opportunity to discuss the Bulletin and download and discuss it with your work crew. 
  • Help your frontline leader provide feedback to Safer Together.
  •  

Follow this link to our library of LEBs.